How Coaches, ADs, and Parent Managers Can Choose a Supplier Who Actually Delivers 

Fast and predictable turnaround matters in rowing. Coaches, athletic directors, and parent managers are juggling regatta schedules, roster changes, weather, and school timelines. When uniforms arrive late, the entire season feels off balance. 

Most delays in team apparel aren’t bad luck. They come from structural weaknesses in how a supplier operates. 

This guide breaks down the real reasons timelines slip, what red flags to watch for, and how to identify a supplier that can consistently produce on time.

 

1. Why Delivery Timelines Fail in Team Apparel 

Most suppliers promise quick turnaround, but very few can consistently deliver it. The most common reasons timelines fall apart include: 

  • Batch-based production 

Some companies leave team stores open year-round but only manufacture when enough orders accumulate. Customers assume production has started, but nothing moves until the batch fills. 

  • Outsourced manufacturing 

When production is spread across different factories, the supplier cannot control the schedule. Lead times depend on other clients, machine availability, and factory staffing, which makes delays common. 

  • Material delays 

If fabrics or trims come from multiple outside vendors, one missing component can pause an entire job before sewing even begins. 

  • Limited production capacity 

Older or low-capacity sublimation equipment struggles during peak seasons and creates bottlenecks. 

  • Seasonal spikes 

Spring and fall ordering surges overwhelm suppliers who don’t control production. 

Timelines fail when suppliers lack control over the full process. 

 

2. Red Flags That Predict Missed Timelines 

Buyers can spot these risks early. Watch for: 

  • Year-round stores without a clear production schedule 

If a supplier cannot tell you how frequently they run production, they are likely batching—and delays follow. 

  • Promises without historical data 

If they cannot show last season’s actual turnaround times, the promise is not grounded in reality. 

  • Limited visibility into production 

A supplier that outsources cannot accurately tell you when your order will start or finish. 

  • Unclear process for matching reorders 

Reorders require consistent color calibration, fabric stability, and identical production settings. If a supplier can’t explain how they ensure this, mismatches become more likely. 

  • Production spread across multiple factories 

This increases the chances of color drift, fabric variation, and inconsistent timing. 

 

3. What Reliable Delivery Actually Requires 

Consistent turnaround comes from structure, not optimism. A reliable supplier has: 

  • Internal or tightly controlled manufacturing 

  • Clear ordering windows 

  • Industrial-grade sublimation equipment 

  • Stable fabric programs with repeatable color profiles 

  • A track record of hitting deadlines 

Without these, quick-turn promises are just marketing. 

 

4. The JL Difference

Some suppliers offer year-round ordering without explaining how often they actually run production. That leaves teams assuming their order has started when it hasn’t. Reliable suppliers are transparent about production timing and capacity. 

JL can offer year-round stores when appropriate, but we make sure teams know exactly when production will run. We set clear ordering windows and communicate schedules so there is no confusion about when uniforms will move into production. This keeps expectations aligned and prevents the uncertainty that comes with open-ended stores. 

JL controls sublimation, sewing, patterning, and quality oversight within its own facilities. The only factor that can occasionally affect timing is fabric logistics, since materials come from external suppliers. Because everything else happens in-house within a family-run operation, fabric availability is the only potential point of delay. Suppliers that outsource multiple stages of production face far more risk because delays can occur at several points in the process. 

This structure is why JL produced ~95% of custom race gear in three weeks last year, not including shipping. 

 

5. What Smart Buyers Should Do Before Choosing a Supplier 

Ask these questions: 

  • What was your actual turnaround performance last season? 

  • Is production in-house or outsourced? 

  • What is the production schedule for my store? 

  • How are reorders matched to previous colors? 

  • Do you batch orders or produce as they come in? 

  • What fabrics and sublimation systems do you use, and how stable are they year to year? 

These questions make it clear which suppliers operate with real control and which rely on hope. 

 

Conclusion 

Delivery issues aren’t random. They stem from how a supplier manages (or doesn’t manage) production, fabrics, equipment, and scheduling. When evaluating a partner, look for internal control, transparency, stable materials, and a consistent track record. JL follows these principles, but the purpose of this guide is to help any coach, AD, or team manager recognize what a reliable supplier looks like long before timelines slip.

January 30, 2026 — Lexi Flynn

Leave a comment

Please note: comments must be approved before they are published.